1) Sunpower restructuring costs to be 2x of the initial estimate
2) Solarbuzz not optimistic about industry supply demand balance, thinks demand needs to get upto 45 GW
3) REC shuts down 2400 tons of high cost polysilicon capacity, still has 20000 tons of FBR capacity
4) GTAT shuts down advanced wafer equipment manufacturing plant as no orders seen until 2014
5) Deutsche Bank sees 34 GW global demand in 2013 with 10 GW from China and 4 GW from India
6) China to add 10 GW of solar capacity in 2013, the most in a single year by any country