India moves in track to have first of its green and clean solar cities in the country. With rapid development and urbanization, there has been a rising demand for energy in the cities of India. The MNRE had selected 60 cities in India where renewable energy forms could be adopted to reduce the usage of traditional power by minimum 10%. A city having population levels between 0.5 – 50 lakh. Solar cities are not a new concept. In fact they have been successfully implemented in Australia and USA.
Capital sanctions of INR 50 lakhs per city was sanctioned to 31 cities. A combination of renewable energy technologies like solar generators, rooftop installations, solar heating systems etc. will be used in the process. Detailed methodology has been put in place to achieve this target. This program will assist local governments in preparing a master plan, which will entail sector wise preparation of energy demand and supply chain currently and over a period of 2013-2018. Based on this a renewable energy resources assessment would be done. The potential sources are listed below:
Solar energy
Thermal Systems
i)Solar water heating systems
ii)Solar cookers (Box and dish type)
iii)Scheffler cookers for indoor cooking
iv)Solar steam generating systems
v)Solar drying/air heating systems
vi)Solar refrigeration and air conditioning plants
vii)Solar concentrators for process heat applications
Photovoltaic Systems
viii)Solar lanterns
ix)Solar home lighting systems
x)Solar generators
xi)Street light solar control systems
xii)Solar hoardings
xiii)Solar street light/garden lights
xiv)Solar traffic lights
xv)Solar blinkers
xvi)Road studs
xvii)Solar power packs
xviii)Building integrated photovoltaic
xix)SPV power plants for decentralization applications
xx)Roof top plants for replacing DG gensets
xxi)Solar charging stations
Biomass &Waste to Energy Projects
i)Power projects based on Municipal and Urban Waste and also on industrial waste through combustion/bio-methanation technologies
ii)Power projects based on methane available from STPs
iii)Bo-mass gasification and co-generation projects in industries
iv)Biomass gasifies based crematoriums
v) Projects on methane utilization for thermal & electrical applications in industries
Wind turbines for power generation
Miro-hydel plants
Solar passive architecture in buildings/housing
Source: MNRE
Read more about Solar Energy in India
Initiated in 2008, the program received formal approval of the government for 50 such cities last week. The master plans of 46 of these cities have been prepared so far.
State-wise status of Solar Cities as on 19.08.2015 | |||
State | Approved Solar Cities | Status of Master Plans | Solar City Cell Created |
1. Andhra Pradesh | 1. Vijayawada | Prepared | Yes |
2. Telangana | 2. Mahbubnagar* | Under Preparation | No |
3. Assam | 3. Guwahati | Prepared | No |
4. Jorhat | Prepared | Yes | |
4. Arunachal Pradesh | 5. Itanagar | Prepared | Yes |
5. Chandigarh | 6. Chandigarh | Prepared | Yes |
6. Chhattisgarh | 7. Bilaspur | Prepared | Yes |
8. Raipur | Prepared | Yes | |
7. Gujarat | 9. Rajkot | Prepared | Yes |
10. Gandhinagar | Prepared | Yes | |
11. Surat | Prepared | Yes | |
8. Goa | 12. Panji City | Prepared | No |
9. Haryana | 13. Gurgaon | Prepared | No |
14. Faridabad | Prepared | Yes | |
10. Himachal Pradesh | 15. Shimla | Prepared | Yes |
16. Hamirpur | Prepared | Yes | |
11. Karnataka | 17. Mysore | Prepared | Yes |
18. Hubli-Dharwad | Prepared | No | |
12. Kerala | 19. Thiruvananthapuram* | Under Preparation | No |
20. Kochi | Under Preparation | No | |
13. Maharashtra | 21. Nagpur | Prepared | Yes |
22. Thane | Prepared | Yes | |
23. Kalyan-Dombivali | Prepared | Yes | |
24. Aurangabad | Prepared | No | |
25. Nanded | Prepared | No | |
26. Shirdi | Prepared | Yes | |
14. Madhya Pradesh | 27. Indore* | Prepared | No |
28. Gwalior | Prepared | Yes | |
29. Bhopal | Prepared | No | |
30. Rewa | Prepared | Yes | |
15. Manipur | 31. Imphal | Prepared | Yes |
16. Mizoram | 32. Aizawl | Prepared | Yes |
17. Nagaland | 33. Kohima | Prepared | Yes |
34. Dimapur | Prepared | No | |
18. Delhi | 35. New Delhi (NDMC area) | Prepared | No |
19. Orissa | 36. Bhubaneswar | Prepared | No |
20. Punjab | 37. Amritsar | Prepared | No |
38. Ludhiana | Prepared | Yes | |
39. SAS Nagar (Mohali) | Under Preparation | No | |
21. Rajasthan | 40. Ajmer | Under Preparation | No |
41. Jaipur | Under Preparation | No | |
42. Jodhpur | Prepared | No | |
22. Tamil Nadu | 43. Coimbatore | Prepared | No |
23. Tripura | 44. Agartala | Prepared | Yes |
24. Uttarakhand | 45. Dehradun | Prepared | Yes |
46. Haridwar & Rishikesh | Prepared | Yes | |
47. Chamoli – Gopeshwar | Prepared | Yes | |
24. Uttar Pradesh | 48. Agra | Prepared | No |
49. Moradabad | Prepared | Yes | |
50. Allahabad | Under Preparation | No | |
25. West Bengal | 51. Howrah | Under Preparation | Yes |
52. Madhyamgram | Prepared | No | |
53. New Town Kolkata | Prepared | Yes | |
26. Jammu & Kashmir | 54. Leh* | Under Preparation | No |
27. Puducherry | 55. Puducherry | Prepared | No |
*Only In-principal approval given.
Source: MNRE
With the new 100 GW solar installation target announced by the Central Government, the country is fast ramping up to achieve whatever it can. The government is surely headed in the right direction to achieve the same. It remains to be seen whether all of this can be accomplished in real and concrete sense or only on paper.